Liquid berth works completed
04 Jan 2023, Pipavav, India
The liquid berth at Pipavav is now operational again and able to handle all liquid/gas cargo vessels, following the completion of technical works.
Read more »
Maximum draft
04 Jan 2023, Dighi, India
The maximum permissible draft for Dighi Port is 9.0 metres, with tide.
Read more »
Repair works at Changi Beach
04 Jan 2023, Singapore
From 3 January to 2 July, repair works are being conducted at Changi Beach.
Read more »
Source: GAC